 |
- Project Supervisor for the Design Process (PSDP) as required by the Safety, Health and Welfare at Work (Construction) Regulations 2006
- Risk analysis and hazard identification
- Eliminating hazards and reducing risk where possible
- Preparation of preliminary health and safety plan
- Liaison with the Project Supervisor Construction Stage (PSCS)
|
|
|